Build sequence: code first, then model integration #11
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
The plan
D.A.I.Sy is built code first, then model integration. The heuristic system has to be proven on the simulation scenarios before a decision model touches either slot. This issue is the sequence: what gets built in what order, what each step depends on, and what done looks like for the whole prototype. The scaffolding PR (#1) is the base everything builds on.
The sequence
Work goes in this order. Each step's issue is the full plan for that step — this issue only sequences them.
Dependencies
What done looks like
The whole sequence is done when the heuristic system — vocabulary, ledger, brain, fallback, Commander, Director, spawning — is proven on the scenario suite, and the model-integration issue can start from a stable, measured baseline. Until then, the prototype is a workbench, not a game system.
Open questions